Don Valley Corporate Centre 150 Ferrand Drive Renovation

The project involved the complete gut, retrofit and re-glazing of a 14-story office tower that had been sitting empty for a number of years. Essentially every floor was stripped back to the bare walls and ceilings including the mechanical and electrical distribution.

This demolition and removal exercise involved the identification and removal of hazardous substances that were directed to dedicated waste sites. The demolition also included the truncation of an adjoining theatre in order to create more at grade parking. The renovation included the Interior design of the main floor lobby, the typical floor elevator lobbies, upgraded and updated typical floor washrooms and a completely new ceiling with state of the art light fixtures. The end result was a class “A” revenue-producing, energy-efficient corporate office building.

Location
Toronto, ON
Completion Status
2007
Client
Don Valley Corporate Centre
Surface Size
275,000 SF
Key Personnel
Jim Strasman
Project Types

SAI was the prime consultant responsible for coordinating all consulting disciplines, interior design and re-glazing design all under a very tight and intense schedule within a Construction Management project delivery contract. The project was completed on time and on schedule.