VIA Rail Toronto Maintenance Centre Modernization

Client: VIA Rail Canada
Location: Toronto, ON
Completion: 2026

The VIA Rail Toronto Maintenance Centre Modernization project will include significant upgrades within the existing rail yard to accommodate 32 new trainsets.

The Toronto Maintenance Centre (TMC) project includes the demolition of a portion of the existing structure of Building C, construction of a new maintenance building addition, removal, and replacement of tracks, as well as the addition of a stand-alone Wheel Lathe Facility, and critical infrastructure improvements throughout the maintenance yard.

The TMC project scope highlights include:

  • Partial demolition of the existing main building
  • Modification to the existing main building
  • New maintenance building addition
  • New Wheel Lathe building (to maintain wheels and ensure smooth operation on the tracks)
  • Infrastructure and Trackside Service Building (TSB) for Vehicle Equipment Measurement Systems (VEMS)
  • Fueling upgrades
  • Stabling upgrades
  • State of Good Repair Work

The new maintenance buildings seek to maintain a similar visual and aesthetic to the existing facilities, while incorporating important changes such as windows that are translucent glass on the south and clear vision glass on the north to allow ample natural light into the interiors and improve the quality of the workspace.

Bina Puri, Strasman Project Manager, talks about working closely with VIA and Buttcon to deliver the TMC project.
Back to top